1、During the project,requirements change for a variety of reasons. As needs change and as work proceeds,additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes,it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may,however,want to track appropriate measures of requirements volatility to judge whether new or revised _____ Are necessary.
A、 proceedings
B、 controls
C、 forecasting’s
D、 prelibations
答案:B
答题解析:
2、根据《计算机软件质量保证计划规范 GB/T 12504—1990》,项目开发组长或其代表_____.
A、 可以作为评审组的成员,不设副组长时可担任评审组的组长
B、 可以作为评审组的成员,但只能担任评审组的副组长
C、 可以作为评审组的成员,但不能担任评审组的组长或副组长
D、 不能挑选为评审组的成员
答案:C
答题解析:
3、根据《软件生存周期过程 GB/T 8566—2001》,开发过程的第一活动是 _____ 。
A、 系统需求分析
B、 过程实施
C、 系统结构设计
D、 使用和维护
答案:B
答题解析:
1、During the project,requirements change for a variety of reasons. As needs change and as work proceeds,additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes,it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may,however,want to track appropriate measures of requirements volatility to judge whether new or revised _____ Are necessary.
A、 proceedings
B、 controls
C、 forecasting’s
D、 prelibations
答案:B
答题解析:
在一个项目的生命期内,有多种原因可以引起对需求的变更。当需要发生变更而工作正在进行时,可导致新的需求产生并迫使现有的需求发生变更。需要快速而有效地管理这些新的需求和新的变更。为了有效地分析这些变更的影响,必须确定每一个需求源,并记录变更的基本过程。无论如何,项目经理希望能追踪有关需求稳定性的、恰当的措施,以判断是否需要新的或修正的控制措施。
A.诉讼 B.控制 C.预测 D.尝试
参考答案:B
2、根据《计算机软件质量保证计划规范 GB/T 12504—1990》,项目开发组长或其代表_____.
A、 可以作为评审组的成员,不设副组长时可担任评审组的组长
B、 可以作为评审组的成员,但只能担任评审组的副组长
C、 可以作为评审组的成员,但不能担任评审组的组长或副组长
D、 不能挑选为评审组的成员
答案:C
答题解析:
《计算机软件质量保证计划规范GB/T 12504—1990》附录C说明:“项目评审小组可以不设副组长;此外,项目开发组长或其代表可以作为评审组的成员,但不能担任评审组的组长或副组长”。
参考答案:C
3、根据《软件生存周期过程 GB/T 8566—2001》,开发过程的第一活动是 _____ 。
A、 系统需求分析
B、 过程实施
C、 系统结构设计
D、 使用和维护
答案:B
答题解析:
根据《软件生存周期过程GB/T 8566—2001》,开发过程包括开发者的活动和任务。开发过程的活动依次是:过程实施、系统需求分析、系统结构设计……
上述的第一个活动为“过程实施”。
参考答案:B